Our 20MW Solar Plant Project
This 20MW power plant is our first decisive step, and tangible commitment to transforming Zambia's energy crisis into an opportunity to power its progress for generations to come.
20-ZLIGHT-SOLAR
As our flagship development, Project 20-ZLIGHT-SOLAR is the tangible manifestation of our mission. It is a strategically designed 20 MWac solar plant that serves as a direct, shovel-ready solution to Zambia's urgent energy needs and the cornerstone of our long-term vision to build a portfolio of renewable energy assets.
Project Snapshot
20-ZLIGHT-SOLAR
20 MWac
Kabwe, Central Province, Zambia
50 Hectares (Secured via LOI)
Approx. 3km to new ZESCO Substation
Tier-1 Solar Photovoltaic (PV) Panels
Developed by Zubalight Energy Ltd., a Registered Engineering Organisation with the Engineering Institution of Zambia (EIZ).
A Strategic Hub
The project is located in the heart of Zambia's Central Province, an area identified as a critical hub for national development and infrastructure growth. Its proximity to key agricultural and institutional developments ensures that the power generated will support a thriving economic corridor. The site was specifically chosen for its high solar irradiation levels and its direct access to major grid infrastructure, as confirmed by our on-the-ground due diligence.
PROJECT HIGHLIGHTS
Key De-Risking Milestones Achieved
Secured Land Asset
A primary hurdle for any infrastructure project is securing suitable land. We have eliminated this risk by identifying and securing a 50-hectare plot of undeveloped land, providing a perfect greenfield site for construction. A formal Letter of Intent (LOI) has been signed with the landowner, guaranteeing the availability of the land for the project. The plot is large enough to comfortably house the 20 MW plant while also providing ample room for a potential Phase 2 expansion.
Verified Grid Connection
Our on-the-ground due diligence has confirmed an exceptional strategic advantage for grid connection. The project site is located just a 3-minute drive from a new ZESCO transmission substation currently under construction. This new, internationally-funded infrastructure is part of the “Sustainable Electricity Supply, Southern Division Project”, ensuring it is built to modern, high-quality standards. This proximity significantly reduces the cost, complexity, and timeline for the evacuation line, providing a secure and reliable offtake for our generated power.
Favourable Government Policy & Urgent National Need
This project is perfectly aligned with Zambia’s national policy and its urgent need for power. The Zambian Cabinet has officially approved an “Open Access” policy for the electricity grid, creating a stable regulatory framework for Independent Power Producers. This is driven by a worsening energy crisis, officially declared a National Disaster and Emergency by the President, which has led to daily 17+ hour load shedding across the country. Our project is a direct solution to this critical national priority.
Proven Local Expertise & Legal Standing
Zubalight Energy Ltd. is a Registered Engineering Organisation, fully licensed and in good standing with the Engineering Institution of Zambia (EIZ). Our leadership team includes former directors of the national utility ZESCO , project managers from the Industrial Development Corporation (IDC) , and engineers with decades of hands-on experience building power infrastructure in Zambia. This unparalleled local expertise ensures we can effectively navigate the regulatory landscape and execute the project to the highest standards.
A Scalable Blueprint for Future Growth
Project 20-ZLIGHT-SOLAR is the cornerstone of our long-term vision, designed not as a one-off project, but as a strategic and replicable blueprint for future growth. The processes, partnerships, and execution model we establish here will be the foundation for a growing portfolio of larger-scale solar plants across Zambia. Our expert team has a track record of managing multi-million dollar projects and is built to scale. This flagship plant will demonstrate our capability to deliver promptly and professionally, paving the way as Zubalight Energy grows into a key player in Zambia’s energy sector.
THIS IS THE PERFECT TIME
The National Context
The Opportunity
Our de-risked project is perfectly positioned to provide a direct solution to one of Southern Africa’s most urgent energy crises. The Zambian government has officially declared the situation a National Disaster and Emergency, creating a stable, pro-investment environment for private power producers. This combination of a massive, verifiable power deficit and clear government support has created a secure and highly compelling investment opportunity.
Key Opportunity Highlights:
- A critical 600+ MW national power deficit.
- Official government policies supporting IPPs, including “Open Access” to the grid.
- A long-term, government-backed PPA structure providing secure, predictable returns.
- An urgent need for power to support Zambia’s goal to triple copper production.